Abstract:In order to realize the joint demonstration and verification of the new type of measurement and control system for ground leveling and control system, including front-end unattended, back-end unified measurement and rear remote support, this paper takes the rocket ground measurement and control integration and information integrated management demonstration and verification system as the research background. Introduced the compatibility of the rocket test and the parallel test simulation. The distributed ground integrated measurement and control technology was proposed. The power, measurement, control and other subsystems and segment tests were unified into the system and based on Distributed measurement and control technology studies the real-time and reliability of system data transmission.