Abstract:The system effectively solves the key links of current satellite mission planning, such as verification, simulation, modification and inversion, etc. It can ensure the correct implementation of satellite mission planning and replace the traditional satellite test bed. It can interpret the task block as a set of executable instructions for the satellite host. In addition, the parameters in the task block and the setting of the task block can be modified by the system. The task block is regenerated and analyzed iteratively to ensure its correctness, improving the efficiency and reliability of task block generation. The system aligns the resulting interpretation result with the action sequence generated by the task planning system, verifying the correctness and rationality of task planning. Reducing the number of personnel and manual operation, shorten the time required for testing, improved testing efficiency. The high-efficiency test scheme has been applied to the satellite ground test, and the application effect is good.