    摘要:

    电梯群控问题是一个具有不确定性和非线性的复杂多目标优化问题,为了研究此类问题,在现有的关于对电梯群控系统仿真研究的基础上,仅针对早高峰时段,即上午7:50到9:10的这个时间段来进行建模仿真。在建模的过程中考虑到排队、乘客等待时间及启停次数等问题, 运用Matlab进行模拟仿真,使各关键参数直观的呈现出来,以便为电梯优化调度方案的提出提供科学且可用的参考数据。

    Abstract:

    Elevator group control problem is a complicated uncertainty and nonlinear multiobjective optimization problems, in order to study this problem, this article will be on the original elevator dispatching strategy, only for early during peak hours, namely 7:50 in the morning to the territory of the time period for modeling and simulation.In the process of modeling considering the queuing, passengers waiting time, and the problem of start-stop frequency using the Matlab simulation, it is concluded that the optimization scheduling solution elevator, allow passengers to reach purpose floor as far as possible short time and avoid crowded conditions.

    参考文献
    相似文献
    引证文献
引用本文

蔡云霄,张敏良.基于Matlab的早高峰电梯群控调度系统仿真研究计算机测量与控制[J].,2018,26(9):97-102.

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:2018-02-26
  • 最后修改日期:2018-03-15
  • 录用日期:2018-03-15
  • 在线发布日期: 2018-09-14
  • 出版日期:
文章二维码