Abstract:Elevator group control problem is a complicated uncertainty and nonlinear multiobjective optimization problems, in order to study this problem, this article will be on the original elevator dispatching strategy, only for early during peak hours, namely 7:50 in the morning to the territory of the time period for modeling and simulation.In the process of modeling considering the queuing, passengers waiting time, and the problem of start-stop frequency using the Matlab simulation, it is concluded that the optimization scheduling solution elevator, allow passengers to reach purpose floor as far as possible short time and avoid crowded conditions.